|
Quasar Logistics Inc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMMODITY RATES |
|
|
|
|
Tariff Rules: |
|
The following rules
apply to all rates unless otherwise stipulated prior to receipt and shipment
and duly noted and published in specific commodity tariff in compliance and
accordance with Federal Maritime Commission regulations. |
|
1.) |
|
a. All rates are CY
Port of Loading /CY Port of Discharge |
|
b. Cargo N.O.S. Worldwide Ports: US
$1500.00 w/m |
|
c. Hazardous Material
Cargo Not Accepted. |
|
|
|
|
2.) |
|
U.S. Terminal
Handling Charges |
|
a. 20'= $575.00,
40'=$625.00 |
|
b. Refrigerated
Container or Trailer Handling, Shipper owned only: $800.00 |
|
c. Bulk Handling:
$47.50 w/m |
|
d. Free Time for
receiving cargo without payment of freight is seven calendar days from day of
receipt for shipment. Demurrage and/or storage charges will thereafter be
assessed at US $15.00 per Diem, or part thereof, up until and inclusive of
the twenty-first day. Thereafter charge will be US$52.00 per diem or part
thereof. |
|
e. Chassis Usage
Charge: $70.00 |
|
f. Line is not
responsible for damages to shipper owned equipment except as stipulated in
the Standards Terms for Carriage set forth in the bill of lading. |
|
g. Heavy Lift/
Overweight Surcharge: Rate/2000 pounds |
|
i. 26000-50000 pounds
rated at $35.50 |
|
ii. From 52000-76000
pounds rated at $27.50 |
|
iii. From
78000-200000 pounds rated at $27.00 |
|
|
|
|
3.) All rates calculated and freight to
be paid in US Currency. |
|
|
|
|
4.)a. Minimum
Tonnage: Minimum weight/volume per single shipment/voyage. |
|
1 Metric Ton or 1
cubic meter, unless otherwise noted and published in specific commodity
tariff. |
|
b. Bulk Minimum: 2500
Metric Tons required. |
|
c. Minimum Freight
Charge: US$250.00, unless otherwise noted and published in specific commodity
tariff. |
|
|
|
|
5.) |
|
a. Brokerage
paid to US Licensed Freight Forwarders: |
|
i.
Caribbean/Antillean Ports (including South America and Central America: Ten
percent of Base Ocean Freight Charges (2.25% O.F.) |
|
b. Commissions paid
to foreign agency (Worldwide): Five percent of Base Ocean Freight Charges
(5.0% O.F.) |
|
c. Commissions paid
or deductible upon receipt of freight. |
|
6.) |
|
Abbreviations: |
|
BAF= Bunker
Adjustment Factor (Fuel Surcharge) |
|
BB= Break bulk |
|
CAF= Currency
Adjustment Factor |
|
CFS= Container
Freight Station |
|
CY= Container Yard |
|
DSC= Destination
Service Charges |
|
HCB= High Cube
Container |
|
LF = Lane foot
(Length of Cargo) |
|
POD= Port of
Discharge |
|
POL= Port of Loading |
|
W/M = Weight or
Measure (1000kg/ 1 cbm: 35.3145 ft²) |
|
20'=20' Standard
Container |
|
40'= 40' Standard
Container |
|
7.) All freight and charges are to be
paid prior to lading on board. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMMODITY
RATES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|